Friday, April 14, 2006

Old Nee Soon


What happen to the bridge?


The old wooden bridge is demolished.


Steel beams.


5 steel girders.


Uncle Chui admiring some birds.


That’s how the bridge look now, Under construction.


Uncle all geared up with water boots and stripping basket.


Ready for action


Some construction going on at the old water hole


The stream leading to Lower Seletar Reservoir


The longkang


Changing fly


Righty Chui


Uncle spotted a few aruans


Stream leading to the highway


All quiet


Ever so sporting Uncle Chui. He walked all the way back for me to take a pic of the haruan.


Haruan caught by uncle Chui


Thank you Uncle Chui.


Caught by the Uncle Chui Popper


Nice haruan


12 inch


Trying trying trying


Dusk arrives


All quiet


Insect bite. Scratching


Uncle Chui still trying


Park lights are switched on at 1900 hours


Setting sun